Warning: Illegal string offset 'lang' in /homepages/22/d157507597/htdocs/mpps/wp-content/plugins/keyword-statistics/keyword-statistics.php on line 353

Warning: Illegal string offset 'keywords' in /homepages/22/d157507597/htdocs/mpps/wp-content/plugins/keyword-statistics/keyword-statistics.php on line 354

Warning: Illegal string offset 'description' in /homepages/22/d157507597/htdocs/mpps/wp-content/plugins/keyword-statistics/keyword-statistics.php on line 356

Archive for April, 2005

Week 4

Tuesday, April 26th, 2005

My wife e-mailed Mr. Anderson and inquired about how the permits and construction were coming along. He replied that the pool was in engineering and all paperwork was being collected. As soon as the construction packet was completed he could set up a tentative schedule.

Week 3:

Friday, April 15th, 2005

We met with Mr. Anderson and picked out colors and tile for the pool. Reviewed and approved the final design.

Week 2:

Tuesday, April 12th, 2005

My wife e-mailed Mr. Anderson asking him how things were coming and if we needed to come down to look at final drawings. He replied that the site survey was complete. We set up an appointment for April 15, 2005.

Measure the Yard

Sunday, April 3rd, 2005

The yard was measured by a Paddock representative.

Search

Recent Posts

Archives