Archive for August, 2005

Footers

Wednesday, August 31st, 2005

Footers for waterfall and side yard wall dug and poured. Waterfall footer did not include footer to existing back wall, only u-shaped. Side yard wall footer poured to even with front of house, past electrical service. No footer dug or poured from side wall to house.
4:00pm called Lloyd Wilson and left message about walls.

Planter

Monday, August 29th, 2005

Area for waterfall cleared out. Small footing dug for retaining wall and waterfall. Noticed footer for back wall of waterfall/planter did not go all the way across to the back yard wall. Only the planter had been cleared.

Week 22

Saturday, August 27th, 2005

4:00pm Home Depot delivered 8x8x16 block and mortar.

Week 20

Monday, August 15th, 2005

I met with Lloyd Wilson around 9:00am at the house. He marked the location for the wall to be replaced. Poco Verde would be out soon to replace it. I had some questions about the rebar in the steps, and wok pot area. The steps were fine but the wok pot drawing he had did not show the 2 tier set up. Along the back wall is +12 then +6 for the wok pot fountain, and +6 for the planter pot behind the wok pot. We discussed wok pot bases. Bases are to be concrete decking material and Saltillo topped, with waterline tile face. The waterfall will be capped with decorative cap, due to cracking from block construction, and then stamped with Saltillo. Waterfall will be faced with waterline tile and random pattern. Waterline tile is to include random deco tile, same as waterfall face. Waterfall retaining wall rebar was placed in the wrong location, will be moved to the waterfall and not along the wok pots. Waterfall needs to be shotcreted so waterline tile can be added to face, but no waterfall has been made yet. I mentioned that no heater had been installed when the electricians were here. He marked the location for the heater near the pumps. He said the salt system, and fiber optics would be installed at a later date also. Passed electrical inspection on 8-12-05. The walkway from the patio to deck was still not in the drawing and resurfacing the patio was unclear. He noted both items. Expressed my dissatisfaction with the whole project and miscommunications between Paddock, their subs, and myself.

Power

Monday, August 8th, 2005

Electricians put in panel and main pool lights.

Week 19

Thursday, August 4th, 2005

Rebar completed today. Still no fence.

Rebar

Wednesday, August 3rd, 2005

The rebar people, 4 men crew, came at 9 am. They worked until around 12:00.
Mrs. Duffy called around 3:45 to see how things were going. I told her that the rebar people had been here this morning. She said that we had been released for the electric portion and that they should be here soon. After the electric was complete, Lloyd would come and inspect it, then call for a city inspection. After that it would be gunnite.
I mentioned that the fence was still not up and that I was concerned that the rebar was just sitting there in the pool and there was no way to keep the neighborhood kids out of our backyard. Mrs. Duffy said that she would get right on Poco Verde and have that fence back up within 48 hours.