ROC

Filled out complaint paperwork for Registrar of Contractors. I drove down to Paddock and gave Debbie Moles a copy of what I was going to submit to ROC. I returned home to meet with Scott Dilliam and Chris from Poco Verde. They assured me that by December 9, 2005 most of the work would be completed and ready for inspection. The water sheer would be raised and the saltio tile would rest on the top of the sheer. The fiber optics, tile, wrought iron fence and waterfall should be complete. I called Debbie Moles and relayed the information I got from Scott. I talked with Bob Owens from Poco Verde, and told him about the quality issues they have.