Wait till Fall

Kimberly called to check if I had been contacted by the heater repair people. I told her that the last time I had heard from anyone was last week.
She said that they would like to wait till fall to repair the main drain. If they were to do an acid stack on the main drain, it would take 72 hours till anyone could swim. I asked her why they couldn’t do it now. The cleaning system wont work correctly and the bottom is staining worse than it already is. She will have to get with the service people to see if it can be done sooner. I asked her about the dirt staining that has been there since they installed the plaster. They have already acid washed it once. I have a footprint on the first step, dirt embedded into the plaster and streaks down the sides. The only thing the last acid wash did, was to make the plaster rough and splotchy. Wouldn’t it be better to fix the drain at the same time they have to fix the stained plaster? She said she would have to get with Edward about this and get back to me. She asked that I give her till Wednesday to call me and let me know what they are going to do.

Comments are closed.

Search

Recent Posts

Archives